Overview
Griffin Structures delivered the 88,000 SF Westminster Police Department Headquarters project at risk utilizing Integrated Project Delivery. This facility replaced the City’s existing building that has been in operation since 1975. The new facility consists of a 88,000 SF, three-story Police Building. The Police Department Building includes a Type 1 jail, Emergency Operations Center, Training Room, Evidence, Forensics, Patrol, Investigations, Dispatch, Office of the Chief, and all related support services, and was constructed as an Essential Facility.
In addition, the facility was designed, constructed, and certified to LEED® Platinum Standards. The facility’s power supply is nearly 100% supported by a 410 KW photo-voltaic (PV) system installed on top of the adjacent parking structure, which was a 590-stall parking structure also delivered by Griffin Structures.